What You Are Actually Paying For Is Under the Roof

The visible roof covering gets all the attention. The deck it is fastened to and the underlayment over that are what decide whether the roof stays on and whether water gets in once it does not.

Tell us the age of the roof and whether anything is actually leaking. Those two answers decide what conversation we are having.

2005

A whole region re-roofed in eighteen months, and it is finishing together

No leak

Most people here are replacing a roof that works. We will say so

Our crews

We inspect, we photograph, and our own people do the work

Licensed

A licensed Florida general contractor

A quote that only prices what you can see

Two quotes for the same roof can differ substantially and both look complete, because the difference sits in things you cannot see from the driveway. Whether the deck is being re-nailed to current requirements, what underlayment is specified, whether a secondary water barrier is included, and how much deck replacement is allowed for — those decisions are where the money is, and a quote that stays quiet about all four is not necessarily cheaper.

The four questions that explain a price difference

  • Is the deck being re-nailed, and to what fastening schedule?
  • What underlayment is specified, by product rather than by category?
  • Is a secondary water barrier included or excluded?
  • How much deck replacement is allowed for, and at what rate beyond it?
  • What happens when more damaged deck is found than expected?

Why these layers matter more than the covering

A roof stays on because it is fastened down properly, and water stays out because there is a competent layer beneath the covering. The covering itself is the sacrificial part — it is what takes the sun and the impact and is expected to be replaced periodically.

That is also why the wind mitigation inspection is interested in deck attachment and secondary water resistance rather than in what the roof looks like. The inspection is asking about the layers underneath, which is a good indication of where the performance actually lives.

How we handle it

  1. 01Inspect the deck once the covering is off, and photograph it.
  2. 02Re-nail to the required schedule as part of the work.
  3. 03Specify underlayment by name rather than by description.
  4. 04Agree the deck replacement rate up front, before it is needed.

We put the deck replacement rate in the quote before anyone knows how much will be needed, because that is the number a homeowner is most exposed on. Agreeing it while nobody knows the quantity is fair to both sides. Agreeing it once the roof is open and the quantity is known is not.

Said plainly

Where we stop

We cannot tell you how much decking needs replacing until the covering is off. Anyone who gives you a fixed total for that before opening the roof is either padding it or is going to come back to you. What we can do is fix the rate in advance so the number is not a surprise.

FAQ

Common questions

Why do two quotes differ so much?
Very often it is deck re-nailing, underlayment specification, whether a secondary water barrier is included, and the deck replacement allowance. Ask both contractors those four questions and the gap usually explains itself.
What is a secondary water barrier?
Broadly, a layer intended to keep water out if the covering is lost. It is one of the items a wind mitigation inspection looks at. Whether it is included is worth confirming explicitly rather than assuming.
How much deck will need replacing?
Nobody knows until the covering is off, and be wary of anyone who says otherwise. What should be agreed in advance is the rate, so that the quantity is the only variable.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.